Paul Perry

Production Engineer

Paul Perry joined the Arene Energy reservoir engineering team in 2024 where he works the Eugene Island 330 field. Previously Paul worked in the production engineering team at Arena Offshore in 2022 in Southern Eugene Island. Before coming to Arena he was a production engineer at Ovintiv, managing 350 producing wells, 880 injection wells, and 462 shut-in injection wells in the Uinta Basin. He holds a BS in petroleum engineering from the University of Louisiana at Lafayette.